We got up early and finished late. Here the crane is lifting a panel of track in place.
These photos and views are my own and do not represent those of my employer.
Wednesday, July 21, 2010
Monday, July 19, 2010
Sunday, July 18, 2010
What was the bulldozer for?
The bulldozer in the previous post was needed to remove the ballast (rock) from the deck of the bridge. Once the ballast is removed, then new panels of track are put in place.
Saturday, July 17, 2010
Heavy Equipment
Sometimes it is necessary to hoist heavy equipment up onto elevated track to aid in removing concrete ties.
Tuesday, July 13, 2010
Replacing concrete ties
Replacing concrete ties on ballast deck. I was waiting to bond the track when the trackhoe was pulling this section down.
Sunday, July 11, 2010
Train meets car
Sometimes the Maintainer is called to the unfortunate side of his job. The train and vehicle collision.
Friday, July 9, 2010
Navigation Lights
When the railroad bridge spans a navigable waterway the Maintainer is responsible for the navigation lights that mark the location of the support piers.
Thursday, July 8, 2010
Burning the rail back together
When it is real cold the rail will pull apart at its weakest point. In order for repairs to be made and to put joint bars on the break they have to get diesel soaked cellulose and lay it next to the rail, set fire to it, and burn it back together. Then the Maintainer can put a cadweld bond on.
Wednesday, July 7, 2010
Undercutter at work
This photo taken in the 1980s shows a machine called an undercutter. Its job is to extract mud from the rock beneath the rails. A chain wraps under the tracks, separates the mud from the rock, and throws the waste to the side (seen above). While removing mud from the rock makes the track firmer, it sometimes pulls up cables which makes the day challenging for a signal maintainer.